Johan Cruijff ArenA

Powered By DfG DfG logo

Biodigester at the ArenA

Biodigester at the ArenA visual

Biodigester at the ArenA

The innovative biodigester, installed within the Johan Cruijff ArenA's facility, supports local businesses in Amsterdam Zuidoost to create value from their own food waste. Non-consumable food waste is transformed into local green energy and natural fertilizer. Besides the food waste from the Johan Cruijff ArenA, food waste from other local businesses is collected by people with a distance to the labour market and brought to this local biodigester. The project starts with collecting food waste from the Johan Cruijff ArenA and the offices of ING bank in Amsterdam Zuidoost.

Self Reported

Overall Project Progress

Project Targets

KPI 1

Number of people employed to help collect food waste and bring it to the Johan Cruijff ArenA's Biodigester. The project's deadline is 2030 to align with the ArenA's 2030 Net Positive Ambitions, with the ambition to hire 7 new employees on average per year. The target is set for the entire duration of the project: 2024 to 2030 (6 years).

0/42 Employees achieved

KPI 2

The Biodigester should generate 10 000 KWH per year to co-power the stadium of the ArenA. The target is set for the entire duration of the project: 2024 to 2030 (6 years).

0/60000 KWH achieved

KPI 3

The Biodigester should generate 20 000 KWH thermal per year to help cool down the data center of the ArenA. The target is set for the entire duration of the project: 2024 to 2030 (6 years).

0/120000 KWH achieved

KPI 4

The Biodigester should help recover 100000 liter of natural fertilizer per year. The target is set for the entire duration of the project: 2024 to 2030 (6 years).

0/600000 Liter achieved

Supported SDG's

sdg_7 sdg_8 sdg_12